sun microsystems
Building 7
Location |
Broomfield, Colorado |
Client |
Sun Microsystems |
Size |
250,000 |
Cost |
$65,000,000 |
Architect
|
Short and Brennan
Denver, Colorado |
- Building remodel for Computer Lab
- Tenant Finish
- Occupied Facility
- 4 Stories plus basement
- Structural Enhancement
- New Duct Work and lighting
- Nora Rubber Floor for Static Control
- Staggered Temperature Openings at windows and below
windows with temperature structure extending out beyond building
- N+1 Redundancy in cooling systems
- Implementation of approximately 1000 Tons of Cooling from existing central plant
- 5000 BTUH of Supplemental Heating
- Integration of High-Heat Density Cooling, utilizing 39 Refrigerant Pumping Units, and 223 Cooling Modules
- Integration of In-Row Modular Cooling Systems
- 95% of 1000-Ton Central Plant was pre-fabricated, and set in building on skids
- Free Cooling Integration
- 130,000 Man Hours Pipefitting, Plumbing, & Sheet Metal Trades – performed in nine month period
- Work performed on a rotating continuous 7-day schedule for duration of job